Project Overview
- Client: Bishop Burton College
- Contract: Houltons
- Sector: Mechanical, Electrical and Design
- Location: East Yorkshire
- Value: £200,000
Services Used
- BIM design and planning
- Oil-fired condensing boiler & water heaters
- Heat recovery ventilation system
- Fire and intruder alarm system
- BMS controls
What We Did
Consistent levels of heating, lighting and power are essential to help keep this specialist sports & agricultural college functioning successfully.
Our mechanical and electrical (MEP) department were heavily involved in this development, which perfectly showcased the excellent combined co-ordination capabilities of our design team.
Carefully planned and utilising enhanced levels of design in BIM format, we used animated visualisations to provide the client with a clear and detailed level of understanding throughout.
The heating and hot water installation was carried out by our mechanical team, via an oil-fired condensing boiler and water heaters, along with universal heat recovery ventilation system.
Our electrical department installed a three-phase distribution system, so that power and light could access all areas backed up by a lightning protection system and BMS controls. A fire alarm and an intruder alarm system provided further peace of mind.