Project Overview

  • Client: Bishop Burton College
  • Contract: Houltons
  • Sector: Mechanical, Electrical and Design
  • Location: East Yorkshire
  • Value: £200,000

Services Used

  • BIM design and planning
  • Oil-fired condensing boiler & water heaters
  • Heat recovery ventilation system
  • Fire and intruder alarm system
  • BMS controls

What We Did

Consistent levels of heating, lighting and power are essential to help keep this specialist sports & agricultural college functioning successfully.

Our mechanical and electrical (MEP) department were heavily involved in this development, which perfectly showcased the excellent combined co-ordination capabilities of our design team.

Carefully planned and utilising enhanced levels of design in BIM format, we used animated visualisations to provide the client with a clear and detailed level of understanding throughout.

The heating and hot water installation was carried out by our mechanical team, via an oil-fired condensing boiler and water heaters, along with universal heat recovery ventilation system.

Our electrical department installed a three-phase distribution system, so that power and light could access all areas backed up by a lightning protection system and BMS controls. A fire alarm and an intruder alarm system provided further peace of mind.